Garnet house Snag List
by anika@ · 101 things on Twos
- 2 floor
- Wall opening to be covered above the entrance door
- Open electricity box
- Window wooden biddings to be polished/painted
- Paint marks on glasses to be removed
- Camera to be painted
- Room 21
- Stopper to be fixed
- Light hanging in living room area
- Kitchen slab to be polished
- Cabinets in kitchen area to be polished
- Exhaust looks untidy
- One drawer in the kitchen cabinet is missing
- Both night lamps missing
- Mirror wooden bidding to be painted
- Mirror needs cleaning
- Both cupboards drawer not polished
- Door handles and latches not painted
- Paint on windows to be removed
- Wiring in washroom to be packed
- Repaint pending on the outside of the balcony doors
- Living room balcony door to be painted
- Terrace and entrance to room 23
- Floor scrubbing
- Wall paint for above the room entrance
- Tile to be cut and fixed
- Wifi not painted
- Paint and finish to be done for these outside the room
- Extra wires hanging from lights
- Room 22
- Door to be painted
- Both night lamps missing
- Ac to be painted
- Paint to be removed from windows
- Window wood finish pending
- Kitchen cabinets polish pending
- Exhaust to be packed
- Mirror wooden corners to painted/polished
- Door handles and latches to be painted
- Washroom cabinets under sink to be closed and polished
- Paint pending on both these electricity boxes
- 1 floor
- Main gate and handle paint
- Mirror bidding polish pending
- Mirror to be cleaned
- Lobby socket dirty
- The pipe on top in the foyer needs to be packed better and painted over
- Room 11
- Wardrobe sliding door to be fixed
- Balcony paint pending
- Blinds missing in washroom
- Walls to be cleaned stickers to be removed
- Ac pipe hanging in balcony
- Door closer is pushing against the cupboard and has damaged polish
- Door not sliding smoothly
- Geyser to be cleaned and wires to be packed
- Room 12
- Door knobs to be painted
- Cupboard inside polish pending
- Ac pipe hanging in balcony
- Room window blind pending
- Common are balcony/foyer balcony
- Grill to be painted
- Floor scrubbing
- Pantry
- Door paint pending
- Cabinet paint and cleaning pending
- Sink cleaning
- Slab and floor scrubbing
- Walls cleaning
- Paint and cleaning
- Room 13
- Washroom scrubbing and cleaning
- Door handles to be painted
- Geyser pipes to be packed
- Wall holes to be packed
- Room 14
- Door lock to be changed
- Wall paint pending
- Window to be painted black
- Both night lamps missing
- Light missing
- Washroom wall to be packed
- Geyser pipes to be packed
- Door locker is damaging the wall behind the door
- Room 15
- Floor scrubbing and polishing pending
- Area outside the window to be cleared of debris/garbage
- Floor needs to be fixed
- Door closer damaging wall
- Room 16
- Seepage on the wall under the television to be solved for
- Paint pending inside the cuboard
- Roof to be packed
- Exhaust to be cleaned and packed properly
- These double holes on all doors in all rooms need to be packed
- Common areas to be scrubbed and cleaned
- These need to be packed in all washrooms
- All washroomWC's to be cleaned and washed throughly
- For the staircase leading up to all the floors, the walls need to be scrapped off of paint and the grills need to be repainted the wooden top needs to be polished
- All windows in the staircase area to be scrapped off of the paint