2526 College Street - Timeline
by Allison · 20 things on Twos
- Effective Date 1/16/22
- 1/17/22 - Day One
- 1/21/22 - Application for Loan Must be completed
- 1/21/22 - Friday - Binder Deposit Due
- 1/25/22 - Tuesday - End of 9 day inspection period
- 2/10/22 - Thursday - Loan Commitment Due
- INSPECTION REPORT NOTES
- UPLOAD termite report
- find out of termite bond covers re-treatment, repair? And....what type of termites? Subterranean or drywood? - Asked Julia if drywood tenting is covered??
- Subpanel not installed with permit - get an electrical contractor to state that all is well? Strap up HVAC lines off the ground. Wrap/insulate lines. When was HVAC last serviced/cleaned? HVAC overflow switch needs to be repaired.
- get verbal quote for HVAC repairs - need to check about undersized return with Jim Hattaway
- call for insurance quotes - $2,786
- Kenny Minor - cost of vapor barrier - $1,000
- Call Lin's electric for cost to remove knob and tube - less than $1,000
- Provide name of Chris - wdo repair person
- research what are the proper setbacks/rules for the pergola -- haven't done!
- Call pool company for details about installation - they are going to do this research
- I provided them with a copy of the seller's terminix bond
- call Mike Sanville and ask again about the instant water heater repair